List down the possible problems in complex cloud network

In this assessment task, you are required to gather, determine and confirm client requirement and
review available network technologies, devices and protocols to build a complex eWAN (Enterprise
Wide Area Network) from an existing small office network by choosing appropriate Cloud Technology,
hardware and software in accordance with business and technical requirements including installation
plan, network design and security.
Company Profile:
Nymum Tiles is a small but growing tiles manufacturing company. Currently, it has only one small
office with 30 inhouse employees including CEO, Jonathon Nymum. It has been operating since
2000. Its main business is to manufacture tiles for local builders. The following departments work in
the company at present.
• Bob Lawn is Sales Manager
• Coby Jaw is Administration Manager
• Decy Brown is Production Manager
• Jonathon Nymum is the CEO of the Management
Current ICT infrastructure: For your understanding, the following is the existing ICT infrastructure
for the company, Nymum Tiles

An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 1
Assessment-III: Project
STUDENT to complete this section
Student Name
Student ID
Date
ASSESSOR to complete this section
Assessor Name
Date
Final Result
First Attempt : Competent Not Yet Competent
Second Attempt : Competent Not Yet Competent
Comments
Assessor Signature
Assessment/evidence gathering conditions
Each assessment component is recorded as either Competent (C) or Not Yet Competent (NYC). A student can
only achieve competence when all assessment components listed under “Purpose of the assessment” section
are recorded as competent. Your trainer will give you feedback after the completion of each assessment. A
student who is assessed as NYC (Not Yet Competent) is eligible for re-assessment.
Resources required for this assessment
• Computer with relevant software applications and access to internet
• Any of the preferred cloud technology provider account
Instructions for Students
Please read the following instructions carefully
• This assessment has to be completed in class or at home
• The assessment is to be completed according to the instructions given by your assessor.
• Feedback on each task will be provided to enable you to determine how your work could be improved. You
will be provided with feedback on your work within two weeks of the assessment due date. All other
feedback will be provided by the end of the term.
• Should you not answer the questions correctly, you will be given feedback on the results and your gaps in
knowledge. You will be given another opportunity to demonstrate your knowledge and skills to be deemed
competent for this unit of competency.
• If you are not sure about any aspect of this assessment, please ask for clarification from your assessor.
• Please refer to the College re-assessment for more information (Student handbook).
NTP: INSTALL, CONFIGURE AND MANAGE ICT NETWORK PROJECT
Project Title: An Industry Trending ICT Complex Networking Project
An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 2
Assessment Task 2: An Industry Trending ICT Complex Networking Project
In this assessment task, you are required to gather, determine and confirm client requirement and
review available network technologies, devices and protocols to build a complex eWAN (Enterprise
Wide Area Network) from an existing small office network by choosing appropriate Cloud Technology,
hardware and software in accordance with business and technical requirements including installation
plan, network design and security.
Company Profile:
Nymum Tiles is a small but growing tiles manufacturing company. Currently, it has only one small
office with 30 inhouse employees including CEO, Jonathon Nymum. It has been operating since
2000. Its main business is to manufacture tiles for local builders. The following departments work in
the company at present.
• Bob Lawn is Sales Manager
• Coby Jaw is Administration Manager
• Decy Brown is Production Manager
• Jonathon Nymum is the CEO of the Management
Current ICT infrastructure: For your understanding, the following is the existing ICT infrastructure
for the company, Nymum Tiles.
The company has spent about $45,000 in order to purchase PCs/Laptops, network hardware and
software. With these hardware and software, the company is happy on internet speed and
communication solution using exchange server 2016.
Challenges: Part- I
An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 3
As we already know that the CEO of the company in Nymum Tiles is happy with their existing network
performance. However, as an IT expert you are required to drag him to the emerging technologies for
more productivity and security. Make a report covering the following key pointsTask-1: An overview of the existing network
a. Device names
b. Cable types Router Model
c. Switch Model
d. Interface IPs
e. Servers and services
f. Network topology
Task-2: Find some industry specific technologies and describe them with the benefits of using them
a. Some specific trending ICT cloud technologies
b. Some specific industry technologies, applications, portals
Task-3: Plan to implement industry specific technologies in the company Nymum Tiles
a. An approval of property access forms
b. Installation plan layout
Task-4: Requirements for implementing your suggested technology
a. Hardware and software requirements
b. Personnel requirements
c. Timeframe
Task-5: Describe how secure the technology you are proposing to the company
a. Firewall configuration
b. ACL/VLAN
c. Network Monitoring tools
Task-6: Describe how you are going to test your suggested technology in Nymum Tiles
a. Packet tracer stimulation
b. VMware Work environment
Task-7: Describe the plan to train up users in Nymum Tiles
a. Managers
b. Staffs
Task-8: Determine environmental considerations involved with using your suggested technology
a. Environment and technology
b. Nymum Tiles adaptation
Task-9: Name the suggested applications, costs and requirements
a. Not technical
b. Compare if you have alternatives
Task-10: Feedbacks collection
a. Ways of collecting feedbacks from users after network installation
b. Sample feedback form
Specifications for the Report:
An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 4
Items Requirements
Word Limit minimum 2000
Font Name Arial
Font Size 10/11
Table of Contents Your key Points
Introduction Need to cover what you are going to write
Current Network Physical and Logical Diagram
Current Application Software and web applications
Suggested Network Diagram Both Physical and Logical
The reason behind your suggestion Benefits belong to
Implementation plan How you want to install
Specific technology suggested Cover the key points above
Technician and Engineer Number of the persons for working
Time How many days you to implement
Workplace safety How will you maintain
PCs/Servers Configuration and compatible with Budget
Routers and Switches Configuration and compatible with Budget
Cable and Firewall Configuration and compatible with Budget
Documentation Training and Documentation
Conclusion What have you covered
Appendix References
Do not forget to cover the following access:
• Each staff member will have complete desktop, access to printer, WiFi Network
• Staff should be able to use the network securely.
• Network Drives for respective Department will be accessible to all Domain users
• CEO has to access all Drives
• Hardware and software should be of industry standards.
• AD and DC will be backed up.
Challenges: Part- II
Changed Scenario of the Company:
Nymum Tiles has now become a very popular brand in the field of tiles manufacturing across
Australia and some overseas companies are asking to open the branches in at least five countries.
Jonathan, the CEO of the company has decided to open the more four branches across Australia in
the following states.
 Adelaide (Existing Head Quarter)
 Sydney
 Melbourne
 Brisbane
 Perth
First phase of the expansion of the network will be finishing at the end of this year. The CEO of the
company Nymum Tiles wants to celebrate national business day for the company on the Christmas
Party with the presence of all branch managers in Adelaide CBD head quarter.
Proposed National Network:
An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 5
From the following diagram, you will have a clear idea about the expansion of the business of Nymum
Tiles.
Second phase of the expansion of Nymum Tiles will be held from the beginning of March next year. In
accordance with the request from the big giants in four countries, Mr. Jonathon, the CEO of Nymum
Tiles, has decide to extend his business in the following four countries.
 India
 Dubai
 Washington
 Kuala Lumpur
To complete this project, you have to cover both national and international phases of Nymum Tiles
Business expansion. Apart from this, you have to migrate the existing on-premise network to cloud
technology. Therefore, this network is a huge complex network. To be successful in this project, you
have to cover the following key points.
Task-1: An overview of extended business of NymumTiles
a. Phase 1 and Phase 2 need to cover
b. Network diagram
Task-2: List down the possible requirements for WAN network
a. Hardware and software requirements
b. Engineer/technician requirements
c. IP subnetting requirements
Task-3: List down the possible requirements for eWAN network
a. Hardware and software requirements
b. Engineer/technician requirements
c. IP subnetting requirements
Task-4: Plan and design a complex network to meet business requirements
a. Identify how it is a complex network
An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 6
b. Design and plan to implement it as a complex network
Task-4: Design and implement a security strategy
a. NACL configuration
b. Availability Zone configuration
c. NAT for inbound and outbound traffic
Task-5: Install and configure a complex network to meet business requirements
a. Physical diagram
b. Logical diagram
c. List down the business requirements
Task-6: Install and configure servers, routers, switches or other devices to provide name resolution
a. Write the steps to be configured
b. Do not forget to mention the models and capacity of the devices
Task-7: Install and configure servers, routers, switches or other devices to provide internet protocol
(IP) addressing and routing
a. IP addressing
b. Mention from interfaces
c. Show in diagram
Task-8: Provide integrated network services across a complex network
a. How to connect all your sites with head office
b. How to use SSH services
Task-9: Plan, design and implement voice and video business communications system
a. Configure skype for business in your server to be used in client side or
b. Other communication solutions for Nymum Tiles
Task-10: Manage and support a complex network
a. List down the possible problems in complex cloud network
b. List the solutions for the possible network problems
Task-11: Set and monitor alerts and logs to capture and analyse network performance data
a. Use AWS monitoring tools
b. Use any other third-party tools to monitor the network
c. Show the snapshot of monitoring data logs
Task-12: Test network functionality and record results
a. Show how your network is working
b. Take snapshot from your working network
Task-13: Complete network documentation according to organisational standards
a. Create user manual for general staffs (just format)
b. Documentation of entire network
You Project must contain the following:
• A standard cover page (Can be used the assessment’s one)
• Table of Contents
• Page number at the bottom right of the page
• Include your course name and student ID on the cover page
• Use the Arial font at either 10pt or 11pt size
An Industry Trending ICT Complex Networking Project – Assessment Task 3 v_1.0 Page 7
Assessment marking guide for trainers
Marking Items
Competent?
✓ X
Introduction
Data Gathering & Presenting techniques
Network Requirement
Hardware and software configuration
Hardware and software Cost
Network Diagram – (should include Router, switch, clients, wifi and printers)
Topology
Configuration
Security Threat Detection and Testing
Backup plan
Project approval Form
Conclusions
Reference
Meeting Minutes